Also included the construction of 3 nos. transfer, jetty and outfall concrete structures for discharge culvert, 300 m long shore protection works and 130,000 m3 excavation for site preparation and 30,000 m3 for embankment. Most of the structures were constructed in dry using sheet pile cofferdams and dewatering system using well points and submerged pumps